For UK contractor-side quantity surveyors

Your monthly commercial cycle, in one place

Valuations, variations and applications for payment on a single workflow, with the contract Bill of Quantities as the spine — instead of eleven spreadsheets that disagree with each other.

{ Built on JCT and NEC4 payment terms · hosted in the UK · audit trail retained 7 years }

Dashboard

Good morning, Sarah

You have 2 critical and 4 high-priority items requiring attention.

Active projects

8

10 in total

Pending approvals

17

Variations & valuations

Outstanding AfPs

£543k

Across 4 projects

Deadlines this week

2

Pay-less windows

My action items (6)

  • Pay Less Notice window closing — AFP-006

    Applied £142,840 · no notice received

    Wandsworth Mixed Use Scheme · Overdue by 7 days

    CRITICAL
  • Review 15 submitted variations awaiting assessment

    Total submitted £231,154.50

    Croydon Town Hall Refurbishment · This week

    HIGH
  • Draft Valuation 2 ready for internal review

    Director approval required before AfP submission

    Guildford Office HQ Cat A Fit-Out · 25 September

    HIGH

Recent activity

  • CVI-009Additional fire dampers, second floor

    AGREED
  • AFP-001£22,913.77 applied for

    SUBMITTED
  • CVI-007Drainage diversion, star rate

    DRAFTED
  • VAL-006Certified at £198,400

    CERTIFIED
  • CVI-006Curtain walling, elevations A–C

    AGREED

Contract forms, payment terms and notice periods handled

  • JCT DESIGN & BUILD 2024
  • JCT STANDARD BUILDING
  • NEC4 OPTION A
  • NEC4 OPTION B
  • JCT INTERMEDIATE
  • NEC4 OPTION C
  • JCT MINOR WORKS
  • BESPOKE AMENDMENTS
0 days
Month-end, down from four or five
0 min
To capture a variation, on site
0%
Of figures derived, not typed
0 yrs
Audit retention, as required
The work, and the record of it

Built around what actually happens on a job

Instructions arrive on site. Money is agreed in a meeting. The application goes out on a date somebody has to hit.

Import the priced bill

Multi-tab Excel tenders read properly, with collection sheets and rollups left out so nothing double-counts.

Capture on site, in two minutes

Photograph attached at the moment of instruction, tags required so nothing gets lost before pricing.

Valuations that derive themselves

Retention, previously certified and contra-charges are calculated from the bill, never typed in.

Construction Act deadlines

Payment and pay-less windows computed from your contract terms, and counted down before they close.

An audit trail that holds up

Every entry hash-chained to the one before it, written in the same transaction as the change itself.

The reports a director asks for

Variation account, CVR, cumulative position and applied against certified, from the same underlying data.

Operatives working among reinforcement bars and materials on a concrete deck
Steel fixers working at height on column reinforcement cages
A completed open-plan interior fit-out with glazing onto a terrace
Getting started

A real tender workbook, not a tidy CSV

Twelve sheets, merged headers, collection pages that restate section totals. Import those without thinking and your contract sum is wrong before anybody has priced a variation.

  • Priced Bill sheets identified and counted
  • Collections and summary rollups excluded, so nothing double-counts
  • The bill locks on import — every change after that is a variation

Guildford-HQ-Tender-Pricing.xlsx

6 sheets found · 2.4 MB

  • Summary
  • Preliminaries
  • Substructure
  • Superstructure
  • Collection
  • Finishes

Ready to import

0 rollup sheets excluded, so nothing double-counts

0

Illustrative — sheet names and counts from a representative tender.

Two people working through calculations on paper between two open laptops
Steel fixers working at height on column reinforcement cages
A completed commercial corridor with glazed partitions and polished screed
The monthly cycle

One cycle, four steps

The Bill of Quantities is the spine that holds them together. Nothing is re-keyed between one step and the next.

  1. STEP 01

    Import the bill once

    Upload the priced BoQ — CSV or a real multi-tab Excel tender. Collection rows and rollups are recognised and left out, so nothing double-counts. The bill then locks, and every change after that flows through a variation.

  2. STEP 02

    Capture variations where they happen

    On site, on a phone, in under two minutes — with the photo attached at the moment of instruction. Tags are required, so nothing gets lost.

  3. STEP 03

    Build the valuation from real data

    Enter progress against the bill. Variations, materials on site and prelims roll in automatically. Retention, previously certified and contra-charges are calculated, never typed.

  4. STEP 04

    Send an application that looks the part

    Submit, and the Application for Payment is generated: Construction Act compliant, with every notice deadline computed from your contract. Your brand on the document, not ours.

The dates that carry a penalty are the ones you should not be calculating

Under the Construction Act, a missed payment notice can make the sum applied for the sum due. CertusQS derives every notice window from your contract terms and counts them down, so the deadline arrives as a warning rather than a letter.

Payment notice due

4days remaining

Computed from the payment due date in your contract, not entered by hand. The pay-less window follows five days behind it.

Two people in a meeting discussing figures on a laptop across a table
Derived, not typed

Every figure traces back to something

A bill line, a variation, or a clause in the contract. Nothing in a valuation is a number somebody remembered.

Valuation 07

Guildford Office HQ · bill locked, figures derived

2.14Reinforced concrete to cores

£151,290

82%

3.02Structural steelwork, frame

£267,800

65%

5.11Curtain walling, elevations A–C

£107,500

40%

7.06Mechanical first fix

£87,724

91%

Gross valuation

Derived from 0 of 4 bill lines

£0

TraceableEvidence attached

The total is calculated from the lines above it, live on this page. Figures are illustrative.

09:41CVI

New variation

Client instructionAdditional worksLevel 2

Additional fire dampers to second floor risers, instructed on site by the CA.

CVI-024 captured

Price it later — the record exists now.

And the record that starts it, made on site

Photograph attached at the moment of instruction, tags required so nothing gets lost. Pricing waits for a desk; the record does not.

Security & trust

You are putting your commercial position into someone else’s software

Here is what that means in practice, stated plainly enough to check.

UK data residency

Your commercial data — the bill, the rates, the margin — is hosted in the UK. No production data leaves the UK, and no analytics profile your team.

An audit trail you can put in front of an adjudicator

Every action is attributed and timestamped, written in the same transaction as the change it describes. Entries are cryptographically chained, so altering history is detectable.

UK GDPR by design

Subject access and erasure are built in, not bolted on. Data minimisation throughout. A Data Processing Agreement is available before any production data is ingested.

Construction Act deadlines, computed

Payment notice and pay-less windows are derived from your contract terms and surfaced as countdowns. Missing one has consequences; the software should not let it happen quietly.

Nothing in this product is deleted. Evidence is superseded rather than removed, and a retracted variation stays in the register in its terminal state — because the record is the point.

A site team in hi-vis and hard hats standing on a newly poured reinforced slab
The glazed facade of a completed modern commercial building against a bright sky
Pricing

Being set with contractors, not at them

CertusQS is in early access with a small number of UK main contractors.

Early access

By arrangement

  • Full monthly commercial cycle, unlimited projects
  • Direct line to the team building it
  • Your feedback shapes what ships next
  • UK hosting and a signed DPA from day one
Talk to us
Early access

Request early access

Tell us who you are and we will be in touch. No newsletter, no drip sequence — a real conversation about whether this fits how your team works.

We store your name and email so we can reply, and nothing else. Privacy notice.